摘要:工程造價管理是現(xiàn)代工程建設(shè)項目管理的重要內(nèi)容之一,也是反映工程項目經(jīng)濟收益與社會效益的一個綜合指標(biāo),因此,工程造價管理是否起到應(yīng)有的作用和意義,將直接關(guān)系工程項目建設(shè)的整體經(jīng)濟目標(biāo)實現(xiàn),以及我國經(jīng)濟的持續(xù)穩(wěn)定、協(xié)調(diào)發(fā)展等許多重大社會問題。在現(xiàn)代工程造價管理工作中,采取何種措施,才能確保管理工作的順利開展,具有深遠的意義,并且對于我國建筑行業(yè)的發(fā)展也是很重要的。
關(guān)鍵詞:現(xiàn)代;工程;造價管理;強化措施;深遠意義
Abstract: The building cost of projects management is one of modern engineering construction project management important contents, is also reflects the engineering project economic gain and a social efficiency overall target, therefore, the building cost of projects management realizes the direct relation engineering project construction’s whole economic target, as well as our country economy continues, the coordinated development stably and so on many significant social questions. In the modern building cost of projects supervisory work, takes what measure, can guarantee that the supervisory work the smooth development, has the profound significance, and regarding our country construction profession’s development is also very important.
Key words: modern age; project; construction cost management; strengthened measure; profound significance
1現(xiàn)代工程造價管理工作的主要任務(wù)及核心問題
現(xiàn)代工程造價管理是一項復(fù)雜而具體、要求較為嚴格的工作,是工程建設(shè)項目管理的主要內(nèi)容之一?,F(xiàn)代工程造價的主要任務(wù)是:檢驗現(xiàn)行計價的合理性;制定或修正工程造價計價依據(jù);監(jiān)督檢查計價依據(jù)的執(zhí)行;調(diào)解和仲裁工程造價糾紛;收集、整理、發(fā)布有關(guān)工程造價信息。
現(xiàn)代工程造價管理工作的核心問題,主要表現(xiàn)為以下幾個階段:
1.1投資估算階段工程造價管理的可行性
工程建設(shè)項目投資估算階段的工程造價管理,主要是根據(jù)工程的整體建設(shè)目標(biāo)和區(qū)域功能定位,對工程造價進行初步的估算與管理。投資估算階段工程造價管理的核心問題是:工程造價的可行性,工程造價組成與項目的制定要符合工程項目的實際需要,絕不可以漫無邊際的進行編撰與模仿,如果不能保證工程造價的可行性,必然難以保障工程造價工作的全面進行,
甚至還會影響到工程的整體進度與建筑質(zhì)量。
1.2施工階段工程造價管理的全面性
在工程建設(shè)項目施工階段,工程造價工作一定要注意管理制度的全面性。施工階段的造價管理內(nèi)容相對具體化、實際化、客觀化。工程造價管理人員要對工程施工所需的機械設(shè)備、建筑材料,以及人員開支等進行系統(tǒng)、全面的監(jiān)督與管理